PHASE 4: POST CONSTRUCTION

Although many contractors believe they can finish a job and walk away, we feel that the close out of a project is one of the most critical steps. You will receive all the documentation from the project including as-built drawings, operations manuals, and balance reports. In addition, we will provide you with the training you need to properly understand how your new system works, and the steps you need to take to keep the system running properly. After the warranty period is complete, our service department will present several methods to provide the long term maintenance your new equipment requires.

  • Service
  • Warranty
  • Owner Training
  • Operations Manuals
  • As-Built Drawings
  • Balance Reports
Post Construction

INDUSTRIES

Electronics

Ensure Higher Yields with Stringent Environmental Control

» learn more

Pharmaceuticals

Understanding Pharmaceutical Cleanroom Design

» learn more

Commercial

Keep Commercial Manufacturing Spaces Clean and Controlled

» learn more

Health Care

Contamination Control Challenges For Health Care Facilities

» learn more

A properly designed cleanroom is certified to class in many areas including cleanliness, particle size and count, temperature, humidity, light level, sound level, room pressure and airflow.